HIGHCLIFF METALS CORP. (IMAHF) 股价表现
查看HIGHCLIFF METALS CORP.股价及公司表现,包括市值,涨跌幅,市盈率,以及历史及当前股价。
昨收 0.16
52周最高 0.16
今开 0.16
52周最低 0.01
振幅 0.00%
市盈率 0%
成交额
0.00
亿
市净率 -9.55%
换手率 0.00%
总市值
0.00亿
股息 0
总股本
0.08
亿
股息收益率 0%
每手股数 1
HIGHCLIFF METALS CORP.公司介绍
I-Minerals is developing the the Bovill Kaolin deposit, a source of high purity potassium feldspar, quartz, kaolin and halloysite. The deposit represents one of the largest undeveloped resources of these minerals in the Western United States. A full feasibility study by GBM Engineers LLC, who were responsible for overall project management and the process plant and infrastructure design, including OPEX and CAPEX calculated an After Tax NPV of US$249.8 million with a 25.8% After Tax IRR. Initial CAPEX was estimated at $108.3 million with a 3.7 year After Tax payback. Other engineering services were provided by HDR Engineering, Inc. (all environmental components; hydrology / hydrogeology; road design); Tetra Tech, Inc. (tailings storage facility design); Mine Development Associates (mine modelling; ore scheduling; mineral reserve estimation); and SRK Consulting (U.S.) Inc. (mineral resource estimation). Project has no impact on any wetlands, meaning no NEPA EIS process is required - only state of Idaho permits. In May 2017, the Idaho Department of Lands ("IDL") accepted our operation and reclamation plan. Together with a water rights permit from the Idaho Department of Water Resources, we are able to proceed with development and construction of the mine, subject to obtaining sufficient financing.